| Name: |
* |
| E-Mail Address: |
* |
| Company: |
* |
| Phone Number: |
* |
| City: |
* |
| State: |
* |
| Country: |
* |
| Desired Date to receive your quote: |
|
| Expected Date of Project Implimentation / Startup: |
|
* - Required Fields
Please fill out the following form to the best of your knowledge.
You do not need to fill out all the fields to receive assistance.
|
Project Scope: |
| Briefly describe the scope of your project and your overall objective: |
|
Input / Output (I/O) Count: |
| Analog Inputs: |
|
| Analog Outputs: |
|
| Discrete Inputs: |
|
| Discrete Outputs: |
|
| Fieldbus: (Yes/No) |
Yes
No
|
| Asi-Bus: (Yes/No) |
Yes
No
|
| Profi-Bus: (Yes/No) |
Yes
No
|
| Wireless Device: (Yes/No) |
Yes
No
|
| Serial Interface to PLC's, Weigh Scales, or other Equipment: |
|
| Other I/O Types: |
|
| Enclosure Desired: (Yes/No) |
Yes
No
|
| Additional Information you can provide about the I/O count (voltage types, % of spare channels desired, any
redundancy needs, location of I/O (in a control room or in a process area)): |
|
Process Application |
| Continuous: (Yes/No) |
Yes
No
|
| Batch: (Yes/No) |
Yes
No
|
| Desecription of the Process: |
|
Operator Interface |
| Number of Operator Workstations: |
|
| Number of Engineering Workstations: |
|
| Number of Other Workstations: (OPC, Historian, etc.) |
|
| Location of Workstations: (control room, in the process area, other locations) |
|
| Number of Process Displays or Graphics desired: |
|
| Batch Report or Historical Reporting Requirements: (Yes/No) |
Yes
No
|
| Requirements for any Mobile Workstations: (Yes/No) |
Yes
No
|
Control System Platform |
| Do you have a preferred control system platform or architecture: (Yes/No) |
Yes
No
|
| Type / Manufacturer: |
|
| Do you have Smart Instruments (HART, Fieldbus, Profibus) installed in your plant?: (Yes/No) |
Yes
No
|
| Do you have Wireless Field Devices installed in your plant?: (Yes/No) |
Yes
No
|
Design / Configuration Requirements |
| Documentation Status: Please list available documentation you can provide if requested: (P&ID, Loop Sheets,
I/O Lists, Process Descriptions, etc...) |
|
| Is the above documentation up to date and accurate?: (Yes/No) |
Yes
No
|
| Do you have interest in Northeast Controls providing any Front End Engineering and Design Services
in support of your project: (Yes/No) |
Yes
No
|
Would you like Northeast Controls to provide configuration services with your control sytem quote?: (Yes/No) |
Yes
No
|
Training Requirements |
Would you like Northeast Controls to provide operator training services with the control system quote?: (Yes/No) |
Yes
No
|
If so, please indicate the number of operators that need to be trained, and number of sessions desired: |
|
Desired location for the training: (plant site, Northeast Training Facility, or local hotel) |
|
Any Other Special Considerations:
|
|
|
|